PDA

View Full Version : Scheduled server downtime - Tuesday, October 16, 2007


fos
10-12-2007, 09:04 PM
The Linux Agora server will be down for a hardware upgrade on Tuesday, October 16, 2007 (see below). The server farm is installing a remote boot option through their control panel system. It should be down no longer than fifteen minutes.

The upgrade on your server listed below is scheduled for Tuesday, October 16, 2007. The upgrade will be performed between 7:00 am and 4:00 pm CDT. While the upgrade is performed, each server will be down for between five (5) and fifteen (15) minutes.

fos